[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"permit-34":3},{"id":4,"acreageLimit":5,"changesFrom2021":6,"code":7,"commonProjects":8,"effectiveDate":14,"environmentalReview":15,"extension":16,"faq":17,"keyConditions":33,"linearFootLimit":40,"meta":41,"name":45,"pcnTrigger":70,"publicComments":51,"purpose":50,"relatedPermits":71,"seo":72,"shortName":46,"sourceDocumentUrl":68,"statutoryAuthority":47,"stem":73,"whoNeedsThis":52,"__hash__":74},"permits/permits/nwp-34.json",10,"The 2026 reissuance of NWP 34 maintains the 10-acre cumulative disturbance limit and the mandatory pre-construction notification requirement found in the 2021 version. The Corps determined that these existing thresholds remain effective in ensuring that authorized discharges result in no more than minimal individual and cumulative adverse environmental effects.\n\nWhile the permit terms are unchanged, the supporting decision document has been updated with the most recent environmental baseline data. This includes results from the 2022 National Lakes Assessment and the 2021 National Wetland Condition Assessment, ensuring that the cumulative impact analysis for the cranberry industry is based on the latest available ecological science.","34",[9,10,11,12,13],"Construction of dikes and berms for water management in cranberry bogs","Installation of water control structures and pump stations","Leveling of existing cranberry beds to improve harvest efficiency","Expansion of an existing cranberry production operation","Modification of irrigation systems involving fill in wetlands","2026-03-15","The Corps determined that the reissuance of NWP 34 results in a 'no effect' finding for federally-listed endangered or threatened species and designated critical habitat. This finding relies on General Condition 18, which mandates that no activity is authorized until project-specific Section 7 consultation is completed if the activity 'might affect' listed resources.\n\nCompliance with Section 106 of the National Historic Preservation Act is ensured through General Condition 20. Because NWP 34 requires a mandatory Pre-Construction Notification for all activities, district engineers have the opportunity to review every proposal for potential impacts to historic properties and ensure necessary consultations are finalized before work begins.","json",[18,21,24,27,30],{"q":19,"a":20},"Do I need to submit a PCN for cranberry bed leveling?","Yes, a Pre-Construction Notification (PCN) is mandatory for all activities authorized by NWP 34 before work begins.",{"q":22,"a":23},"What is the maximum acreage limit for NWP 34?","The cumulative total acreage of disturbance, including filling and flooding, must not exceed 10 acres per cranberry production operation.",{"q":25,"a":26},"Can I use NWP 34 to start a brand-new cranberry farm?","No, NWP 34 is only for the expansion, enhancement, or modification of existing cranberry production operations.",{"q":28,"a":29},"Does this permit allow for a permanent loss of wetlands?","No, the permit specifically states that the activity must not result in a net loss of wetland acreage.",{"q":31,"a":32},"What happens if I need to disturb more than 10 acres?","Activities exceeding the 10-acre cumulative disturbance limit are not eligible for NWP 34 and would typically require an individual permit.",[34,35,36,37,38,39],"Cumulative total acreage of disturbance cannot exceed 10 acres per operation","The activity must not result in a net loss of wetland acreage","Pre-Construction Notification (PCN) is mandatory for all activities","Only authorized for existing cranberry production operations","Does not authorize the construction of new cranberry farms in new locations","Temporary fills must be removed and the site restored",null,{"path":42,"body":43,"title":69},"/permits/nwp-34",{"id":44,"code":7,"name":45,"shortName":46,"statutoryAuthority":47,"acreageLimit":5,"linearFootLimit":40,"pcnTrigger":48,"effectiveDate":14,"purpose":50,"changesFrom2021":6,"environmentalReview":15,"publicComments":51,"whoNeedsThis":52,"commonProjects":53,"keyConditions":54,"faq":55,"relatedPermits":61,"seo":65,"sourceDocumentUrl":68},"nwp-34","Cranberry Production Activities","NWP 34","404",{"type":49},"mandatory","Nationwide Permit 34 authorizes the discharge of dredged or fill material into waters of the United States for various activities associated with existing cranberry production. This includes the construction of dikes, berms, and pumps, the installation of water control structures, and the leveling of cranberry beds for expansion, enhancement, or modification of an existing operation.\n\nThe permit is specifically designed to support the ongoing needs of the cranberry industry while protecting aquatic resources. It is restricted to existing operations, meaning it cannot be used to establish a brand-new cranberry farm in a location where one did not previously exist. A critical requirement is that the activity must not result in a net loss of wetland acreage.","Public comments regarding NWP 34 generally focused on the 10-acre limit and the requirement for no net loss of wetlands. Some commenters suggested that the 10-acre limit is too high for a general permit, while others argued it is necessary for the economic viability of cranberry farms. The Corps responded that the limit is a cumulative total per operation and, combined with the no net loss requirement, ensures minimal environmental impact.\n\nOther commenters requested clarification on what constitutes an 'existing' operation. The Corps clarified that this NWP is intended for the expansion or modification of operations that are already in production or have been previously authorized, rather than the conversion of pristine wetlands into new cranberry bogs.","Compliance managers and owners of existing cranberry farms use this permit for infrastructure and bed management. It is essential for agricultural operations needing to modify water management systems or expand existing bogs into jurisdictional wetlands.",[9,10,11,12,13],[34,35,36,37,38,39],[56,57,58,59,60],{"q":19,"a":20},{"q":22,"a":23},{"q":25,"a":26},{"q":28,"a":29},{"q":31,"a":32},[62,63,64],"NWP-3","NWP-27","NWP-40",{"title":66,"description":67},"NWP 34: Cranberry Production Activities - 2026 Permit Guide","Nationwide Permit 34 (NWP 34) for cranberry production in wetlands. 10-acre disturbance limit, mandatory PCN, and no net loss of wetlands on Course Clear.","https://cdn.courseclear.io/usace/decision_documents/NWP-34-2026-Final-Decision-Document.pdf","Nwp 34",{"type":49},[62,63,64],{"title":66,"description":67},"permits/nwp-34","8XcgGBv_Zhs5JkbhGoVNJrB-kAiksEYB40A9hvKmWHM"]